2. On-site investigation
①Contrasting with the EIA report and approval documents, verify on-site whether the actual construction content, production scale, production process, product plan, raw and auxiliary materials, production equipment, site selection, and number of personnel of the project are consistent with the EIA, and whether the layout of the plant is consistent; Changes should be analyzed whether they constitute major changes, and if not involved, the reasons for the changes and the circumstances of the changes should also be recorded.
②Waste water, waste gas, solid waste production link, production volume, whether the specific pollutants have changed; whether the pollution prevention measures are consistent, what are the changes, whether the prevention measures are accepted and the test operation analysis is up to the standard discharge (at the same time record the points that need to be monitored and the pollution ); Whether the size, location, storage volume, and usage of the temporary solid waste storage facilities are consistent with the environmental assessment.
③For projects involving hazardous waste, hazardous waste should be more detailed: first, whether the production link, amount and type of hazardous waste are consistent with the environmental assessment, whether there are omissions in the environmental assessment; whether the capacity of the hazardous waste storage site (facility) is Meet the storage and turnover requirements of hazardous waste generation.
Hazardous waste prevention and control measures: Whether the construction area and location of the temporary storage room for hazardous waste meet the requirements, and whether the construction of the temporary storage room meets the "Hazardous Waste Storage Pollution Control Standard" (GB 18597-2001) and the relevant requirements in the standard amendment. See below for specific requirements.
Short comment: Xuheng also provides leak lock plug for refurbishing old barrels. If you have purchase requirements, please contact us.
Orange Peel, The Painting Problem Of DrumsJuly 1, 2022Orange peelThe uneven appearance of the paint coating, which resembles the peel of an orange or walnut, is called orange peel.The reasons are as follows:1) The construction viscosity is too high and t...view
The Introduction of Silver FoilJuly 24, 2023Abstract:A hot stamping material made of metal aluminum directly rolled into thin sheets, the hot stamping effect is similar to that of pure silver foil, so it is also called false silver foil. Due to...view
Meeting Modern Challenges in Drum Packaging IndustryJune 30, 2022While sustainability is high on the agenda of many companies in the industry, it is certainly not the only factor influencing buying decisions. Increasing competition in the highly fragmented lubrican...view
Overview Of Metal Packaging Container ClosureJuly 1, 2022The metal sealing compound is used for the sealing of rigid packaging containers and is mainly used for the sealing of various bottles, cans and barrels. In order to make the seal good, rubber or resi...view
Filling and Storing the Pail After Opening for ShipmentNovember 10, 2023When unlocking the bucket hoop, removing the bucket top cover, and installing the bucket cover and hoop, be careful not to get your hands caught in the gap between the bucket hoops, which may cause ac...view